Location

The property is ideally located in the heart of the Rhine-Neckar area. The nearest freeway access (A62 Schifferstadt) to the A65 can be reached in approx. 4 km without passing through the town.

The A5 and A6 motorways can be reached in 20 minutes by car. A large workforce potential, generous residential and commercial areas as well as an above-average purchasing power characterize the Rhine-Neckar region as a strategically favorable location.

55469 Simmern
(Rheinland-Pfalz)
Germany

65,300

Clear Height
10 – 12m

702,883

SITE & BUILDING SPECS

65,300

702,883

Total Size of Property 160,003 SQ M
(1722,258 SQ FT)
Warehouse ca. 55,000 SQ M
(592,015 SQ FT)
Offices ca. 3,500 SQ M
(37,673 SQ FT)
Mezzanine ca. 6,800 SQ M
(73,194 SQ FT)
Car parking spaces
203
Trailer parking spaces
30
Dock Doors
66
Drive in Ramps
5
Floor loading capacity
5 – 7t/m²
Clear Height
10 – 12 m
ESFR-Sprinkler-System FM Global

Economic Region

The district town of Simmern in Rhineland-Palatinate is characterised by its central location between the metropolitan regions of Rhine-Main, Rhineland, France and the BeNeLux states. This strategic location provides access to approximately 31,500,000 million consumers in the regions within 3 hours by lorry, which represents a significant market potential for companies. The central location ensures excellent accessibility from Simmern to the most important conurbations in Europe. The location therefore offers an attractive base for companies wishing to benefit from proximity to the major markets.

LOCATION AND TRAVEL DISTANCES

Destination Km
Koblenz
55
Mainz / Wiesbaden
63
Frankfurt am Main
103
Mannheim
112
Destination Km
Saarbrucken
133
Cologne
158
Karlsruhe
174
Dusseldorf
196

SUSTAINABLE EXCELLENCE

GLP’s logistics- and distribution properties meet high sustainability criteria worldwide through environmentally sound building solutions. All new developments in Germany are certified to at least the DGNB Gold standard, making them more cost-effective to operate and maintain. In addition to reducing operating costs for users, GLP contributes to sustainability by improving the CO2 balance, reducing energy and water consumption, and selecting certified and recyclable building materials.

Contact

    Please contact me via: E-MailTelephone

    I agree that my data from the contact form are raised and processed to the answer of my inquiry. The data will be deleted after your request has been processed.

    *required

    Michael Gerke

    Head of Development Germany

    Taunusanlage 1 – Skyper, 18. OG
    60329 Frankfurt am Main
    Germany