Location
The property is ideally located in the heart of the Rhine-Neckar area. The nearest freeway access (A62 Schifferstadt) to the A65 can be reached in approx. 4 km without passing through the town.
The A5 and A6 motorways can be reached in 20 minutes by car. A large workforce potential, generous residential and commercial areas as well as an above-average purchasing power characterize the Rhine-Neckar region as a strategically favorable location.
55469 Simmern
(Rheinland-Pfalz)
Germany
65,300
Clear Height
10 – 12m
702,883
SITE & BUILDING SPECS
65,300
702,883
Total Size of Property | 160,003 SQ M (1722,258 SQ FT) |
Warehouse | ca. 55,000 SQ M (592,015 SQ FT) |
Offices | ca. 3,500 SQ M (37,673 SQ FT) |
Mezzanine | ca. 6,800 SQ M (73,194 SQ FT) |
Car parking spaces
|
203 |
Trailer parking spaces
|
30 |
Dock Doors
|
66 |
Drive in Ramps
|
5 |
Floor loading capacity
|
5 – 7t/m² |
Clear Height
|
10 – 12 m |
ESFR-Sprinkler-System FM Global |
Economic Region
The district town of Simmern in Rhineland-Palatinate is characterised by its central location between the metropolitan regions of Rhine-Main, Rhineland, France and the BeNeLux states. This strategic location provides access to approximately 31,500,000 million consumers in the regions within 3 hours by lorry, which represents a significant market potential for companies. The central location ensures excellent accessibility from Simmern to the most important conurbations in Europe. The location therefore offers an attractive base for companies wishing to benefit from proximity to the major markets.
LOCATION AND TRAVEL DISTANCES
Destination | Km |
Koblenz
|
55 |
Mainz / Wiesbaden
|
63 |
Frankfurt am Main
|
103 |
Mannheim
|
112 |
Destination | Km |
Saarbrucken
|
133 |
Cologne
|
158 |
Karlsruhe
|
174 |
Dusseldorf
|
196 |
SUSTAINABLE EXCELLENCE
GLP’s logistics- and distribution properties meet high sustainability criteria worldwide through environmentally sound building solutions. All new developments in Germany are certified to at least the DGNB Gold standard, making them more cost-effective to operate and maintain. In addition to reducing operating costs for users, GLP contributes to sustainability by improving the CO2 balance, reducing energy and water consumption, and selecting certified and recyclable building materials.
Contact
Michael Gerke
Head of Development Germany
Taunusanlage 1 – Skyper, 18. OG
60329 Frankfurt am Main
Germany